Hi,
We are conducting research on solar activity in the U.S. and would like access to the following data:
• Note that we do not need the original records nor need scanned copies – just the data that can be produced in excel or CSV format by the software used by your department to track permits and an email receipt is preferred.
• Issued Residential and Commercial solar (photovoltaic - PV) permits from 11/01/2022 to 11/30/2022. If a separate Solar Permit category is not used in the permitting system, please provide data on all Building and Electrical Permits within the time frame specified AND
• Issued Residential and Commercial Energy Storage Systems permits from 11/01/2022 to 11/30/2022 . If a separate Energy Storage category is not used in the permitting system, please provide data on all Building and Electrical Permits within the time frame specified
• The following data points: permit number, permit status, permit address, contractor, issue date, final date, permit type, sub-type, valuation (if available), work description and if possible please include Storage/Battery Manufacturer Name.
• If possible, please provide the reports in CSV or excel format.
• If available, we need application, issue & final / completion date for the solar permits.
It's okay if there is a delay in this request, given the current situation with COVID-19.
Regards, and stay safe,
Chris
Attached are the full reports of ALL issued permits during the time period requested.
Respectfully,
Vera Clauson
Building Dept Asst.
Request Date
2022-12-02
Agency Tracking
2022-0202
Acquisition Notes
This record was automatically imported from https://www.townforms.com/FOIADirect-ChelmsfordMACitizens/
Hi,
We are conducting research on solar activity in the U.S. and would like access to the following data:
• Note that we do not need the original records nor need scanned copies – just the data that can be produced in excel or CSV format by the software used by your department to track permits and an email receipt is preferred.
• Issued Residential and Commercial solar (photovoltaic - PV) permits from 11/01/2022 to 11/30/2022. If a separate Solar Permit category is not used in the permitting system, please provide data on all Building and Electrical Permits within the time frame specified AND
• Issued Residential and Commercial Energy Storage Systems permits from 11/01/2022 to 11/30/2022 . If a separate Energy Storage category is not used in the permitting system, please provide data on all Building and Electrical Permits within the time frame specified
• The following data points: permit number, permit status, permit address, contractor, issue date, final date, permit type, sub-type, valuation (if available), work description and if possible please include Storage/Battery Manufacturer Name.
• If possible, please provide the reports in CSV or excel format.
• If available, we need application, issue & final / completion date for the solar permits.
It's okay if there is a delay in this request, given the current situation with COVID-19.
Regards, and stay safe,
Chris
Attached are the full reports of ALL issued permits during the time period requested.
Respectfully,
Vera Clauson
Building Dept Asst.
Request Date
2022-12-02
Agency Tracking
2022-0202
Acquisition Notes
This record was automatically imported from https://www.townforms.com/FOIADirect-ChelmsfordMACitizens/