Hi,
We are conducting research on solar activity in the U.S. and would like access to the following data:
• Note that we do not need the original records nor need scanned copies – just the data that can be produced in excel or CSV format by the software used by your department to track permits and an email receipt is preferred.
• Issued Residential and Commercial solar (photovoltaic - PV) permits from 10/1/2022 to 10/31/2022. If a separate Solar Permit category is not used in the permitting system, please provide data on all Building and Electrical Permits within the time frame specified AND
• Issued Residential and Commercial Energy Storage Systems permits from 10/1/2022 to 10/31/2022. If a separate Energy Storage category is not used in the permitting system, please provide data on all Building and Electrical Permits within the time frame specified
• The following data points: permit number, permit status, permit address, contractor, issue date, permit type, sub-type, valuation (if available), work description and if possible, please include Storage/Battery Manufacturer Name.
• If possible, please provide the reports in CSV or excel format.
• If available, we need Application date and final / completion date for the solar permits.
It's okay if there is a delay in this request, given the current situation with COVID-19.
Regards, and stay safe,
Chris
Attached are ALL permits issued in the month of OCTOBER 2022. Our system does not differentiate between permit types. Just look at the description under Residential Building and Electrical to locate solar projects.
Vera Clauson
Building Dept Asst/FOIA RAO
Request Date
2022-11-02
Agency Tracking
2022-0191
Acquisition Notes
This record was automatically imported from https://www.townforms.com/FOIADirect-ChelmsfordMACitizens/
Hi,
We are conducting research on solar activity in the U.S. and would like access to the following data:
• Note that we do not need the original records nor need scanned copies – just the data that can be produced in excel or CSV format by the software used by your department to track permits and an email receipt is preferred.
• Issued Residential and Commercial solar (photovoltaic - PV) permits from 10/1/2022 to 10/31/2022. If a separate Solar Permit category is not used in the permitting system, please provide data on all Building and Electrical Permits within the time frame specified AND
• Issued Residential and Commercial Energy Storage Systems permits from 10/1/2022 to 10/31/2022. If a separate Energy Storage category is not used in the permitting system, please provide data on all Building and Electrical Permits within the time frame specified
• The following data points: permit number, permit status, permit address, contractor, issue date, permit type, sub-type, valuation (if available), work description and if possible, please include Storage/Battery Manufacturer Name.
• If possible, please provide the reports in CSV or excel format.
• If available, we need Application date and final / completion date for the solar permits.
It's okay if there is a delay in this request, given the current situation with COVID-19.
Regards, and stay safe,
Chris
Attached are ALL permits issued in the month of OCTOBER 2022. Our system does not differentiate between permit types. Just look at the description under Residential Building and Electrical to locate solar projects.
Vera Clauson
Building Dept Asst/FOIA RAO
Request Date
2022-11-02
Agency Tracking
2022-0191
Acquisition Notes
This record was automatically imported from https://www.townforms.com/FOIADirect-ChelmsfordMACitizens/